Jasper-Mount Robson Fiber Installation

Bridge and road maintenance planning in Haida Gwaii

Majestic Pine Developments – Mud Lake Subdivision

Coquihalla River corridor flood response

Highlighted Projects

Jasper-Mount Robson Fiber Installation

Making a path for connectivity

The installation of sensing and communication optical fibre with overhead, trenched and Horizontal Directional Drill designs. The fibre routing involves crossing roads, rivers and railways to connect facilities along the Highway 16 corridor. The project leverages drone LiDAR, 3D model photogrammetry, Engineered fibre crossing designs and provincial & federal permitting process.

Bridge and road maintenance planning in Haida Gwaii

Remote access on the archipelago

Ongoing inspection and maintenance planning of remote roads and bridges on Haida Gwaii (prev. Queen Charlotte Islands). Remote boat-in areas, helicopter drop off and floatplane access adds to the challenge of maintaining road access on the archipelago.

Majestic Pine Developments – Mud Lake Subdivision

Lakeside development planning, permitting and Engineered design

The planning, permitting and Engineered design of Majestic Pine Developments, Mud Lake Subdivision roughly 30 kilometers northwest of Campbell River, BC. The developments consists of 25+ lakeside and lakeview recreational properties, including road development, creek crossings, lot survey, well and septic considerations. The project leverages drone LiDAR and 3D modelling, detailed road & crossing designs and Municipal & Provincial permitting process.

Coquihalla River corridor flood response

Emergency flood response on the Coquihalla

A multi-year restoration of roads, bridges and facilities along the Coquihalla River corridor, following the 2021 major flooding event. The immediate need for rapid-response Engineering solutions to emergency flooding events leads to ongoing revetment, protection and restoration efforts on river systems in the Interior BC corridor.